Other projects

See our other realizations

  • DK8 National Road. Section Piotrków Trybunalski – Rawa Mazowiecka.

    Preparation of complex study documentation, construction and tender documentation. Consortium MOSTY KATOWICE (Leader) – COMPLEX PROJEKT.

  • A1 Motorway. 50 km section „Sośnica” – the border with Czech Republic (Gorzyczki).

    Preparation of the basic project along with materials for the location decision.

    The order ABiEA Warsaw.

  • A4 Motorway. The bypass of Cracow from Zakopianska Street to the interchange „Wielicka” (including the interchange).

    Preparation of the Building and Executive Design along with Tender Documentation – under supervision of Atkins.

  • A4 Motorway. Bypass of Krakow from the interchange “Balice I” to the Kapielowa Street.

    Preparation of materials for the location decision.

  • A4 Motorway. Bypass of Krakow from Kapielowa Street to the interchange “Wielicka” (including the interchange).

    Preparation of Materials for the location decision.

  • Preparation of the design of the western bypass of the city Lubliniec.
  • A4 Motorway. Bypass of Krakow from the interchange “Balice I” to interchange “Wielicka” (including the interchange)

    Preparation of the Preliminary Design for the tolled section of the motorway.

  • A4 Motorway. Toll motorway Krakow – Katowice. Participation in the development of the Preliminary design and documents for obtaining the location decision in cooperation with Transprojekt Poznan for the adjustment of payment (tolled section).
  • Northern bypass of Bytom. 4.2 km section.

    Preparation of the Technical Project – Phase II and III.

  • S94 Expressway to Zwardon, 800m long tunnel in Laliki along the expressway to Zwardon.

    Preparation of the concept design. The concept of tunnel was a realization of the own idea, which was carried out with the Austrian tunnelling firm as well as Science and Research Unit „Budokop” Mysłowice and the office Pontex from Mysłowice.

  • S94 Expressway. Bypass of Laliki and National Road 944 from Zywiec to Zwardon (4 separate sections of contract).

    Preparation of Technical Design and Tender Documents in accordance with PHARE requirements.

  • A4 Motorway. Bypass of Krakow. Section: interchange Zakopanski – interchange Wielicki.

    Preparation of complex technical motorway droject.

  • DK92 National Road. Section Gliwice – Tychy.

    Preparation of Technical Design and Tender Documentation according to the requirements of the World Bank in bilingual version.

  • DK93 National Road. Section: interchange “Mikołowska” – Piotrowice in Katowice.

    Preparation of Technical Project and Tender Documents in compliance with the requirements of the World Bank in bilingual versions.

  • DK15 National Road. Section of the east route of the GOP (Silesian Industrial Area). Section Wojkowice – Jęzor.

    Preparation of Technical Design and Tender Documents in compliance with the requirements of the World Bank in bilingual version.

  • A4 Motorway. The passage of Aleja Gornoslaska in Katowice. Participation in the road design process.
  • Bypass of Piekary Slaskie and bypass of Bytom.

    Preparation of One-Phase Technical Design – multi-branch study.

  • The bypass of Praszka. – multi-branch study.
  • Strzelcow Bytomskich Street in Bytom.

    Preparation of Technical Design of Reconstruction – conceptional.

  • A comprehensive road and street network in Olesno.

    Preparation of system and detailed traffic management for the entire network.

  • Transport system in Sosnowiec – Klimontowska Street.**

    Preparation of Technical Design – multi-branch study.

  • DK1 National Road. Warsaw – Cieszyn.

    Preparation of the Technical Design of reconstruction and the repair of 5 viaducts along with the adaptation to mining damages.

  • Transport system of suburb Ligota in Katowice, Obrzeżna Street – Kostki Street, Napierski Street with the tram.

    Preparation of technical and economic assumptions – complex multi-branch study.